Future Plans And Projects That Need Funding

Below you can find the projects of the Bethsaida Orphans Education Center. Theese project are not yet finished or not funded at all. Any help will be highly apreciated.
Note: Each cost estimation on this page will only show the money needed left. The downloadable document will show the whole costs. If wished, funders can be mentioned on this page.
Our currency converter will automatically convert the TZS into the selected currency.

Show costs under the projects below in
Show converter info

This currency converter will convert the amounts into the selected currency. The exchangerates are grabbed from http://fx-rate.net/TZS/ by a self-made script. If you miss any currency, please contact our administrator.

Construction of Water Harvesting Tank

As part of their life skills education and in order to ensure that they get a balanced diet while at school, the girls are tending a vegetable garden with a variety of crops. Each girl has a plot to tend. However, the water supply from the school bore hole is salty and not good for vegetable gardening. Excessive salinity will render the soil to be barren with time. Since there is ample roofing surface, we deem it worthwhile to harvest rain water and store it for irrigating the vegetable garden in the dry season. A 150,000 litre capacity water tank would suffice for this endeavor.

Show estimated costs

Type of works Costs in TZS Costs in [not selected]
Tank construction works 9,262,500
Gutter fixing works 2,100,000
Plumbing works 3,692,250
TOTAL 15,054,750

Download detailed cost estimation.(43.7KB)

Construction of Road Tanel

For the upper mentioned water harvesting tank we'd need a road tanel to carry the water to the tank.

Show estimated costs

Type of works Costs in TZS Costs in [not selected]
Material costs 2,270,500
Labour charges 1,500,000
TOTAL 3,770,500

Download detailed cost estimation.(34.8KB)

Completion of Infirmary

The girls need appropriate medical and health care support including psychological, moral and spiritual guidance and counseling in order to shed off the stigmatization and trauma they had undergone as a result of societal neglect and abandonment that for many led into life in the street, drug and sex abuse and other vices. The rehabilitation sessions for the stigmatized and traumatized orphan girls are conducted while the pupils are in Forms 1 and 2. During the day medical services are provided at Mpigi Magohe government dispensary 2 km away from the school. At the end of 2011 a Volunteer Missionary Doctor arrived at school. For efficient and effective medical and health care support services to the girls, it is imperative for BOEC to construct an infirmary at the school.

Through well wishers efforts the construction of the infirmary has started, at the school. However, completion of the building requires the placement of a ceiling, floor, room partitioning, doors, wall painting, electrical installations and fixtures in terms of piped water, sinks and toilets and the provision of furniture.

Show estimated costs

Type of works Costs in TZS Costs in [not selected]
Ceiling works 4,116,500
Partition works 1,782,000
Electrical installations 2,820,980
Paint works 1,005,000
Floor works 1,680,000
Fixture works 2,100,000
Furniture Requirements 7,320,000
TOTAL 20,823,980

Download detailed cost estimation.(31.8KB)

BOEC Office

BOEC has been managing its affairs from a borrowed office on the 1st Floor of TANMEC building, Mandela Road (Port Access Road), Dar Es Salaam. In order to efficiently and effectively perform its functions, BOEC now desires to have its own office on its landed property at Mpigi Magohe area, Msakuzi Ward, Kinondoni Municipality, Dar Es Salaam. Through well wishers efforts the construction of the office structure has started, at the Bethsaida Girls’ Secondary School premises. However, completion of the building requires the placement of a ceiling, windows, room partitioning, doors, wall painting, electrical installations and furniture.

Show estimated costs

Type of works Costs in TZS Costs in [not selected]
Ceiling works 4,133,500
Partition works(6 rooms) 6,753,400
Electrical installations 2,820,980
Paint works 1,005,000
Window works(Aluminium) 2,400,000
Fixture works 1,120,000
TOTAL 18,232,880

Download detailed cost estimation.(40.0KB)

BETHSAIDA GSS CONSTRUCTION OF STAFF HOUSES

Head of School: 1
Teachers: 9
Administrative Officer: 1
Accountant: 1
Procurement and Stores Officer: 1
Nurse/Matron: 1
Office Management Secretary: 1
Total: 15

Show estimated costs

Type of works Costs in TZS Costs in [not selected]
Construction works 19,026,400
Roofing works 3,326,560
Fixture works 8,398,000
Paint works 1,005,000
Ceiling works 4,133,500
Electrical installations 2,820,980
TOTAL 38,710,440

Download detailed cost estimation.(45.0KB)